Buyer tools

Plan the shipmentbefore you sign

Four working instruments used daily by our Indore export desk: stuffing maths against real maritime payload ceilings, the Incoterms 2020 transfer of cost and risk, an institutional RFQ that reaches our desk directly, and the analytical bands behind every lot.

01 / SmartFreight

Container load calculator

Select the commodity, packaging format and equipment. The calculator applies loose bulk density, packaging stow factor and tare against the 28,000 kg payload ceiling of a 20ft unit and 28,800 kg of a 40ft unit, then reports the cube and the number of containers your lot requires.

Loose bulk density 520 kg/m³ · carriage 04 °C

Breathable, preferred for rice and pulses

25 MT
1 MT= 25.00 MT500 MT

Containers required

2× 20ft general purpose

Payload used45%

28,000 kg ceiling

Cube used81%

33.2 m³ internal

Stuffing is limited by volume. One 20ft general purpose takes about 15.4 MT of fresh raw garlic in jute bags 50 kg.

Cargo weight

25,000 kg

Packaging tare

350 kg

Gross weight

25,350 kg

Total volume

53.8 m³ CBM

02 / Incoterms® 2020

Risk and cost transfer matrix

EXW, FOB from Mundra or JNPT, CFR, CIF and DAP mapped across the full chain from our Indore packhouse to your named place, showing precisely where Abhaam Corp's obligation ends and yours begins.

CIFCost, Insurance and Freight

Incoterms® 2020

Named destination port, e.g. Jebel Ali (AEJEA)

Packhouse

Grading, packing, marking at origin

Loading

Cargo loaded on the outbound truck

Inland haulage

Indore to gateway port

Export clearance

Customs, phytosanitary, CoO

On board vessel

Stuffed, VGM filed, loaded on board

Ocean freight

Main carriage to discharge port

Marine insurance

Cover for the main carriage

Discharge

Unloading at destination port

Import clearance

Duty, taxes, destination customs

Delivery

Carriage to the buyer's named place

Abhaam Corp bears cost Abhaam Corp bears risk Buyer's account

What we deliver

Freight and marine insurance to the discharge port are on our account. Risk transfers on board at the load port, so the policy is assigned to the buyer.

Buyer responsibility

Most common term for our UAE, Africa and Southeast Asia lanes.

Insurance: Abhaam Corp provides minimum ICC(C) cover, 110% of invoice value

03 / RFQ

Institutional request for quotation

Specification, packaging, trade term and discharge port in four steps. Submissions are registered against a reference number at our Indore desk, which replies with a documented offer, packing plan and inspection protocol.

  1. 1Specification
  2. 2Packaging
  3. 3Trade term
  4. 4Port & buyer

Moisture, purity, grade, certification requirements

04 / Quality

Lab specifications and phytosanitary compliance

Moisture, purity and mesh bands per product line, alongside our APEDA, FSSAI, ISO-aligned and FIEO credentials and the phytosanitary documentation issued for every consignment.

Every consignment ships against a phytosanitary certificate, a certificate of origin and a lot-level inspection report. Third-party inspection by SGS, Intertek or a buyer nominee is accepted at loading.